Home Categories Send inquiry

What is the need for the inspection of control valve


The control valves are a very important part of a process certain control valves do the protection of the equipment during the over-pressure. So the proper operation of the control valve is required for equipment safety. So if we need to ensure the safety of the device then the control valve must be inspected. There are different types of control valves like globe valve, ball valve, etc, and each of them serves an important purpose in a process so if these valves are not working properly then the process will be interrupted or there could be equipment damage so we need to make sure that the control valve is operating properly. The inspection of the control valve parts must be done and if there are any abnormalities then they must be taken care of.

Inspection before the installation
The control valve should be inspected before its installation so that we can find out if there is any fault in the control valve and it can be rectified. Steps to do the valve inspection before its installation.
• The direction of the flow must be determined to ensure the proper installation, some valves are not bidirectional. So when swing check valves are installed then flow direction must be checked
• Visually check the valve and look for any foreign material in the valve because it can damage the valve
• The actuator position must be determined

In service inspection
The control valves are inspected in service to determine if there is any problem in the valve during its operation and also to check if the components are functioning properly under the routine operating conditions. During the inspection of the valve during the service, we would need to do certain adjustments such as adjusting the packing so that the valve can be kept in good operating conditions. We need to check the stuffing box and flanges so that we could know if there is a leak or not. So if there are defects in the valve then we should take action to recover them

How to check a control valve while receiving it from the manufacturer?

Visual inspection
• Surface matching control
• Check the handwheel
• The seat body attachment and the seat control must be checked
• The finishing of the flanges must be checked
• Check the ports
• Check the body dimensions of the valve
• Check the end dimensions
• The finish on the flange face and ring joints must be checked
• Face to face dimension
• The outside diameter of the flange, bolt circle diameter, bolt hole diameter, flange thickness
• Body valve thickness
• Stem diameter and threaded ends must be checked
The field inspector must check the inspection documents and also for any mechanical damage that could happen during the shipping. We need to check if the valve is properly shipped or not.
The following factors must be checked to verify if the control valve is shipped properly
• All the valves should be completely drained of test fluid and it should be dried after the hydro-testing
• The end flanges and weld flanges of the valves must be fitted with covers, and the cover diameter must be the same as the outside diameter of the flange and it should be thick too.
• The raised face portion of the flange and the ring joint groove must be covered with heavy grease. A heavy-duty moisture-proof disc must be fitted between the greased flange face and the cover. The diameter of the disc should be equal to the inside diameter of the bolt holes
• The ends of threaded and socket weld end valves must be protected with tight-fitting plastic caps

Surface inspection
Linear and other typical surface imperfection must be checked for depth. If the depth is more than the acceptable limit which is specified for the wall thickness then these imperfections could be injurious. So the parts must be checked to determine if it is free from injurious imperfections. The mechanical marks on the abrasion and the pits must be acceptable and if it exceeds the acceptable limit then it must be removed by machining or grinding to sound metal. The marking should be on the body or in the identification plates and the acceptable marking methods are cast, forged, stamped, electro-etched, Vibro-etched, or laser-etched. The unidirectional valves must be marked with flow or pressure indication. The identification plate must be marked with the trim identification marking. The ring joining flanges must be marked with a ring groove number on the edge of the piping flange. There should be an indication for the ball, plug, or disk position for the quarter-turn type valves.